Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-migrate-db domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jogang/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jogang/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the g5plus-darna domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jogang/public_html/wp-includes/functions.php on line 6121
Olympics Standard Swimming Pool – JOGANG Perfect Engineering Ltd.
JOGANG Perfect Engineering Ltd. -

Olympics Standard Swimming Pool

Olympics Standard Swimming Pool

IN
Investor Name:
Newlife
Published Date:
March 29, 2025
Location:
Kilifi County, Mavueni
Value:
Architecture:
About Project

https://jogang.com/portfolio/olympics-standard-swimming-pool/

Olympic Size Standard Swimming Pool
As experienced swimming pool contractors, we deliver FINA-compliant Olympic-standard aquatic facilities. Our latest project features a precision-engineered 50m x 25m competition pool (2.5-million-liter capacity), complemented by a child-friendly wading pool and beautifully landscaped surroundings. The integrated facility building houses state-of-the-art filtration systems, pump equipment, and changing rooms, topped with a functional observation deck – showcasing our turnkey construction capabilities for world-class aquatic venues.