Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-migrate-db domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jogang/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jogang/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the g5plus-darna domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jogang/public_html/wp-includes/functions.php on line 6121
Multipurpose Hall – JOGANG Perfect Engineering Ltd.
JOGANG Perfect Engineering Ltd. -

Multipurpose Hall

Multipurpose Hall

IN
Investor Name:
Newlife
Published Date:
April 1, 2025
Location:
Kilifi County, Mavueni
Value:
Architecture:
About Project

https://jogang.com/portfolio/multipurpose-hall/

Multipurpose Hall

The multipurpose hall is a state-of-the-art facility designed for versatility and performance. It features two terraced seating levels that provide excellent sightlines to the podium, ensuring optimal visibility from both tiers. The hall’s acoustics are meticulously engineered to enhance sound quality, making it ideal for a wide range of events, from performances to conferences. The roof is constructed from a continuous run of Saflok 700 sheets, creating a sleek, arched structure that adds to the hall’s aesthetic appeal while providing excellent structural integrity. This roofing design also contributes to the hall’s acoustics and overall energy efficiency. Equipped with modern HVAC systems and an elevator for accessibility, the hall is both functional and comfortable, ensuring a superior experience for all attendees. The combination of innovative design, high-quality materials, and advanced technology makes this facility a standout feature of the school